IMAGE 3-1
Initial sitework for foundation.
|
|
IMAGE 3-2
Steel beams for interior beam and girder
system.
|
|
IMAGE 3-3
Erection of 1st floor ICF block.
|
IMAGE 3-4
Prepour for 1st floor walls.
|
|
IMAGE 3-5
Ready for the 1st floor wall pour.
|
|
IMAGE 3-6
After 1st floor wall pour.
|
IMAGE 3-7
Erection of 2nd floor porches on steel system with concrete columns.
|
|
IMAGE 3-8
2nd story wall pour.
|
|
IMAGE 3-9
Ready to pour the 2nd story floors with 4" of concrete.
|
IMAGE 3-10
Interior illustrating connection of
mutilple material types. |
|
IMAGE 3-11
Roof decked and lathing providing air convection channel between metal roof and roof
sub-structure. |
|
IMAGE 3-12
Standing seam metal roof to increase energy efficiency.
|