|
|
Initial sitework for foundation. |
|
Steel beams for interior beam and girder
system. |
|
Erection of 1st floor ICF block.
|
Prepour for 1st floor walls. |
|
Ready for the 1st floor wall pour. |
|
After 1st floor wall pour.
|
Erection of 2nd floor porches on steel system with concrete columns.
|
|
2nd story wall pour. |
|
Ready to pour the 2nd story floors with 4" of concrete.
|
Interior illustrating connection of
mutilple material types. |
|
Roof decked and lathing providing air convection channel between metal roof and roof
sub-structure. |
|
Standing seam metal roof to increase energy efficiency.
|